A few years after moving into a new Korean apartment, the question comes up: is this leak still covered by the builder's defect warranty? Article 36 of the Multi-Family Housing Management Act makes the developer liable for defects in apartment buildings and leaves the warranty periods to be set by presidential decree within 10 years, by load-bearing structure and by type of construction work. Enforcement Decree Art. 36(1) sets 10 years for the load-bearing structure and refers the rest to Table 4, which gives finishing work such as wallpaper and tiles 2 years, building services such as plumbing, windows and electrics 3 years, and waterproofing, reinforced concrete and roofing 5 years. The Act also fixes the starting point: inside the flat (the exclusive part) from the day it was handed over to the occupant, and for common parts such as corridors and exterior walls from the use inspection date (Act Art. 36(3)). Enter the date and the type of work and the calculator shows the last day and the days left.
1. Periods — load-bearing structure 10 years (Decree Art. 36(1)1); construction work under Table 4: finishing 2 years · building services, windows, electrics, landscaping and others 3 years · site works, reinforced concrete, steel frame, masonry, roofing and waterproofing 5 years; ground works 10 years (note to Table 4).
2. Starting point — exclusive part from handover to the occupant; common parts from the use inspection date (Act Art. 36(3)).
3. Claim and repair — claim from the developer within the warranty period; within 15 days the developer must repair or send a written repair plan (Decree Art. 38(1) and (3)).
4. Our example — for a complex inspected on 15 March 2024, the common-part water supply and drainage (3 years) runs to 14 March 2027, with 116 days left as of 18 November 2026 (our arithmetic).
Calculator
The calculator updates as you type. Act Art. 36(3) says the period “counts from” the dates it lists, so we count the start date as day one and, following Civil Act Art. 160(2), take the last day as “the day before the date corresponding to the start date N years later” (our arithmetic). Leaving the first day out (Civil Act Art. 157, main text) would make it a day later, and Civil Act Art. 161 moves a last day that falls on a Saturday or public holiday to the next day; the calculator does not move the date but shows the weekday and a note in the table — if you are close to the end, claim first rather than relying on the date. Work types are shortened names of the 21 groups in Table 4.
The provisions — original text
| Provision | What the original says | Points to note (our reading) |
|---|---|---|
| Act Art. 36(1) | The following developers bear warranty liability arising from the sale for defects in multi-family housing (for the contractors in items 3 and 4, a contractor's warranty liability): 1. persons under the Housing Act Art. 2 item 10; 2. a builder who obtained a building permit under the Building Act Art. 11 and built multi-family housing for sale; 3. a contractor who carried out works under Art. 35(1)2; 4. a contractor who carried out remodelling under the Housing Act Art. 66. | The side that sold the flats is the basic obligor. If a main contractor built the whole project under a lump-sum contract, Art. 37(1) treats that contractor as the developer. |
| Act Art. 36(3) | The warranty periods are set by presidential decree within 10 years, by load-bearing structure and by type of construction work, having regard to the seriousness of the defect, the service life of the installation and whether it can be replaced. The period runs from: 1. exclusive part: the day it was handed over to the occupant (to the tenant, for public rental housing); 2. common parts: the use inspection date under the Housing Act Art. 49 (the temporary use approval date if the whole complex received one, or the partial or building-by-building inspection date if inspected that way), or the use approval date under the Building Act Art. 22. | The same work ends on different days inside your flat and in the common parts. A late move-in pushes the exclusive-part deadline back by the same amount. |
| Act Art. 36(4) | A defect is a fault caused by an error in construction, such as cracking, settlement, breakage, lifting or leaking, serious enough to impair the building or installation in safety, function or appearance; its precise scope is set by presidential decree. | An error in construction is the premise. Ordinary wear from use falls outside this definition (our reading). |
| Decree Art. 36(1) | 1. Warranty period for defects in the load-bearing structure (the main structural parts under the Building Act Art. 2(1)7): 10 years. 2. Warranty period for defects by type of construction work: the period in Table 4. | Decree Art. 37 item 1 defines load-bearing defects — collapse of the structure, or cracking or settlement that creates or threatens a structural safety risk. |
| Decree Art. 37 item 2 | Defects by type of work: cracking, sagging, twisting, lifting, settlement, breakage, collapse, leaking, seepage or detachment, faulty operation or function, faulty fixing, earthing or wiring, and plants dying or failing to stand, caused by an error in construction and serious enough to impair safety, function or appearance. | Landscaping trees dying is on the list too (landscaping, 3 years). |
| Decree Art. 38(1) | Where a defect arises, the residents' representative body and others, or the tenants, must claim repair from the developer within the warranty period. | Paragraph 2 splits who claims: the occupant (or public rental tenant) for the exclusive part; the residents' council, management body or owners' association for common parts. |
| Decree Art. 38(3) | Within 15 days of the claim the developer must repair the defect or notify the local authority and the claimant in writing of a repair plan stating the part, method and the time reasonably needed, and repair under that plan (…). Unless materials, equipment or labour are hard to obtain or there is another special reason, the repair period must be within 60 days. | If the developer thinks it is not a defect, it must give its reasons in writing (proviso). |
| Decree Art. 39(1) | The developer must notify the residents' council (or the public rental tenants' council) in writing of the expiry date of the warranty period at least 30 days before it expires. | This is the “developer must notify by” row in the calculator. When the notice arrives, it is time to gather the remaining defects and claim. |
| Act Art. 37(2) | Where a defect arises during the warranty period, the developer is liable to compensate for the loss caused by it; Article 667 of the Civil Act applies mutatis mutandis. | Not only repair: loss caused by the defect is also covered. |
| Civil Act Art. 667(1)(2) | Where the finished work, or a part completed before finishing, has a defect, the person ordering the work may require the contractor to repair it within a reasonable period, unless the defect is minor and repair would cost too much. (2) Instead of or together with repair, that person may claim damages (our translation). | Act Art. 37(2) applies Art. 667 alone. Civil Act Art. 670 (claims within 1 year of handover) is not on that list, so we read the time limit as the Housing Management Act warranty period (our reading). |
| Act Art. 37(3) (two versions) | Now (in force 1 July 2026): the method and standards for investigating defects and calculating repair costs, for repairs claimed under paragraph (1) and liability under paragraph (2), may follow the defect assessment standards set under Art. 39(4). · Version in force 13 May 2028 (amended 12 May 2026): … are set by Presidential Decree (our translation). | The investigation and repair-cost standards move from the defect assessment standards to the Decree. Art. 36, which sets the warranty periods, has no version awaiting entry into force, so the calculator is unchanged. |
| Civil Act Art. 157 | Where a period is set in days, weeks, months or years, the first day is not counted, unless the period begins at midnight (our translation). | Act Art. 36(3) separately says the period counts from the listed dates, so the calculator takes the handover or use inspection date as day one. Leaving it out would make the last day one day later (our reading). |
| Civil Act Art. 160(2)(3) | Where a period is not counted from the start of a week, month or year, it ends on the day before the date corresponding to the starting date in the last week, month or year. If the last month has no corresponding date, it ends on the last day of that month (our translation). | This is the calculator's “day before the same date N years later”. A 29 February start ends on 28 February in a year without one. |
| Civil Act Art. 161 | Where the last day of a period falls on a Saturday or a public holiday, the period ends on the following day (our translation). | The “weekend note” row in the calculator. We did not read case law on whether this applies to claims within the warranty period, so the last day itself is not moved. |
Table 4 — warranty periods by type of work
| Period | Type of work (number in Table 4) | Some detailed items |
|---|---|---|
| 2 years | 1. Finishing | plastering, interior finishing, painting, wallpaper, tiles, interior stone, built-in furniture, kitchen fittings, appliances |
| 3 years | 2. Outdoor water supply and sanitation · 3. Heating, cooling, ventilation and air handling · 4. Water supply, drainage and sanitary fittings · 5. Gas · 6. Carpentry · 7. Windows and doors · 8. Landscaping · 9. Electrical and power · 10. Renewable energy · 11. Telecoms · 12. Smart home network · 13. Fire protection · 14. Insulation · 15. Miscellaneous | underfloor heating (incl. pipes in the floor slab), piping, water supply, window frames and doors, glazing, lifts, automatic fire detection, wall, ceiling and floor insulation |
| 5 years | 16. Site works · 17. Reinforced concrete · 18. Steel frame · 19. Masonry · 20. Roofing · 21. Waterproofing | earthworks, stone embankments, retaining walls, paving; general and precast concrete; brick, block and exterior stone; gutters and rainwater pipes; waterproofing |
| 10 years | Note — ground works such as foundations and piling under the Act on Ownership and Management of Aggregate Buildings Art. 9-2(1)1 | (note to Table 4) |
On the Table 4 page the period appears only on the first line of each run — 2 years on line 1 (finishing), 3 years on line 2, and 5 years on line 16. We read each period as continuing until the next one appears (our reading). Stone work is 2 years inside the building (finishing) but 5 years outside (masonry), and both civil and building retaining walls sit in the 5-year group.
Five sums — our examples
| Example (ours) | Last day | As of 18 November 2026 (our arithmetic) |
|---|---|---|
| Common parts, inspected 2024-03-15, finishing (2 years) | 2026-03-14 | already over by 249 days |
| Common parts, same date, water supply and drainage (3 years) | 2027-03-14 | 116 days left — the developer must give notice of expiry by 2027-02-12 |
| Common parts, same date, waterproofing (5 years) | 2029-03-14 | 847 days left |
| Common parts, same date, load-bearing structure (10 years) | 2034-03-14 | 2,673 days left |
| Exclusive part, handed over 2024-05-20, finishing (2 years) | 2026-05-19 | already over by 183 days |
The second row is the calculator's default. For a complex inspected on 15 March 2024, the common-part water supply and drainage ends the day before the same date three years later, 14 March 2027; with the check date set to 18 November 2026, 116 days are left. The developer must tell the residents' council of the expiry date in writing 30 days earlier, by 12 February 2027 (Decree Art. 39(1); dates are our arithmetic).
The default last day, 14 March 2027, is a Sunday (our arithmetic). Civil Act Art. 161 says a period whose last day is a Saturday or public holiday “ends on the following day”; treating Sunday as a public holiday, that reads as Monday 15 March (our reading). We have not checked whether the article applies to the warranty period as such, so claiming by Friday 12 March at the latest is the safer course (our suggestion).
The first and fifth rows show that the same 2-year finishing work ends on different days when the start differs. Common parts count from the use inspection date and the inside of your flat from handover, so a household that moved in later can claim for defects inside the flat for longer (our reading).
How to claim — who, and by when
- Inside your flat (exclusive part) — the occupant claims directly, or can have the management body do it (Decree Art. 38(2)).
- Common parts — the residents' council, the management body or the owners' association under the Aggregate Buildings Act claims; occupants can ask them to (same paragraph).
- Deadline — the claim must be made within the warranty period (Art. 38(1)). As the end approaches, photograph the defect, note the date and claim first (our reading).
- The developer's reply — repair or a written repair plan within 15 days; repairs within 60 days unless there is a special reason (Art. 38(3)).
- Defect repair deposit — the developer must keep a defect repair deposit for the warranty period (the guarantee period counted from the common parts), except where the developer is the state, a local government, the Korea Land and Housing Corporation or a local public corporation (Act Art. 38(1)).
What this calculator does not do
- Decide whether it is a defect — whether it is a construction error or ordinary wear is for the Defect Review and Dispute Mediation Committee and the defect assessment standards, which we did not read.
- Every detailed item — the list works in the 21 groups of Table 4; find detailed items in the table above.
- Officetels and other buildings — only multi-family housing under this Act. We did not read the warranty rules of the Aggregate Buildings Act.
- Civil claims and limitation periods — not covered.
Read next
- Money back when you move out — long-term repair reserve refund calculator.
- Steps in buying an apartment — buying an apartment step by step.
- Who pays that year's property tax — property tax 1 June assessment date checker.
Checklist
- ☐ Your complex's use inspection date (start for common parts)
- ☐ The day your flat was handed over (start for the exclusive part; housing handover certificate)
- ☐ Which type of work the defect belongs to — the Table 4 group number
- ☐ Photos of the defect and the date you found it
- ☐ The date you sent the claim, and whether a reply (repair or repair plan) came within 15 days
Questions that remain
Where do I find the handover date?
When a flat is handed over, the developer must make a housing handover certificate and pass it to the management body, which must publish the handover date on the Multi-Family Housing Management Information System within 30 days (Decree Art. 36(2)). Ask the management office (our reading).
Is a defect found after the period simply out of time?
Decree Art. 38(1) says to claim within the warranty period. Civil Act Art. 667, which Act Art. 37(2) applies to damages, sets out the repair and damages claims only; Civil Act Art. 670 (1 year from handover) is not on that list. We did not read case law on whether other routes exist for defects found later (such as civil claims).
Are condensation and mould defects?
Act Art. 36(4) and Decree Art. 37 treat faults caused by an error in construction as defects. Whether condensation comes from faulty insulation (3 years) or from how a home is used is a matter of assessment that this calculator does not decide (our reading).
Sources
- Korea Law Information Center — Multi-Family Housing Management Act Arts. 36(1)(3)(4), 37(1)(2)(3), 38(1) — original (current, in force 1 July 2026, Act No. 21447), checked 18 November 2026. Arts. 37 to 39 are shown with versions in force from 13 May 2028, so Art. 37(3) is given in both.
- Korea Law Information Center — Enforcement Decree Arts. 36, 37, 38(1)-(3), 39(1) and Table 4 (amended 5 January 2021) — original (current, in force 1 July 2026, Presidential Decree No. 36424), checked 18 November 2026.
- Korea Law Information Center — Civil Act Arts. 157, 159, 160, 161, 667, 670 — original (current, in force 17 March 2026, Act No. 21454), checked 18 November 2026. Start and end of periods, calendar counting, Saturdays and public holidays, the contractor’s warranty and its time limit.
- Not read. Case law or guidance on whether Civil Act Art. 161 applies to the warranty period, the defect assessment standards (Ministry of Land notice), the Defect Review and Dispute Mediation Committee procedure (Act Art. 39 onward), Decree Art. 39(2) onward (ending the warranty), the amount and uses of the defect repair deposit, the Aggregate Buildings Act warranty rules, and the Housing Act Art. 49 (use inspection).
- What we added. Reading the Table 4 periods as continuing through each group, taking the last day as the day before the same date N years later, the five examples and the days left, the weekday and “weekend note” rows (our reading of Civil Act Art. 161).
We checked the calculator script against a separate Python version of the same arithmetic in 6,440 cases for each of the Korean and English pages, with no mismatches.
Where to check further
- Your management office — the use inspection date, each flat's handover date and the developer's expiry notice.
- Multi-Family Housing Management Information System (K-apt) — published handover dates.
- Your city, county or district housing department — a correction order when the developer ignores a claim (Act Art. 37(5)).
Written on 18 November 2026. The provisions are quoted from the original; the readings and arithmetic are ours.