Calculators

Daily Worker Unemployment Benefit Checker (Korea) — Under One-Third Working Days Since the 1st of Last Month, or 14 Days Off for Construction

Daily Worker Unemployment Benefit Checker (Korea) — Under One-Third Working Days Since the 1st of Last Month, or 14 Days Off for Construction

Can a day labourer whose work dries up claim Korean unemployment benefit? Article 40(1) of the Employment Insurance Act lists six conditions for the job-seeking benefit, and items 5 and 6 apply only to someone who was a daily worker when they last left a job. A daily worker, under Article 2(6), is “a person employed for less than one month”. The key test is item 5(a): from the first day of the month before the month of application up to the application date, working days must be less than one-third of the total days in that window. Enter an application date and the checker shows the window and the most working days allowed.

1. From the 1st of last month to the application date, working days under one-third — applying on 26 October allows up to 18 of 56 days.
2. Construction day workers also qualify with 14 straight days without work before applying.
3. If you quit another job for a disqualifying reason in the base period, you need 90 or more days as a daily worker.

Checker

Daily worker unemployment benefit checker Employment Insurance Act Art. 40(1) items 5–6 · Art. 49
days
days
Result 0 -

Updates as you type. It checks items 1, 5 and 6 of Art. 40(1) only; items 2–4 (willing and able to work, no disqualifying reason for the last job, active job search) are not judged here. The 180-day count itself is in the insured period calculator.

Add this calculator to your blog or site

Paste the code into your editor’s HTML view. A source link comes with it below the calculator. Where iframes are blocked, only the link remains.

The articles

TypeWhat the source saysWorth noting (ours)
Art. 40(1), provisoItems 5 and 6 apply only to a person who was a daily worker at the time of the last separation.Not looked at if your last job was regular employment
Art. 40(1) item 1Insured unit periods in the base period total 180 days or moreApplies to daily workers too
Item 5(a)Working days from the first day of the month before the month of the application date up to the application date total less than one-third of all days in that period“Less than”, so exactly one-third fails
Item 5(b)A construction day worker (a daily worker in construction under the Korean Standard Industrial Classification when leaving) with no work record for 14 consecutive days before the application dateEither (a) or (b) satisfies item 5
Item 6If, in the base period, the person left another business for a reason that disqualifies under Art. 58, they must have worked 90 days or more of those insured days as a daily workerNothing to check without such a separation
Art. 49(1)The first 7 days from reporting unemployment are a waiting period with no benefit; a person who was a construction day worker is paid counting from the day of reporting.No waiting period for construction day workers

The item 5 window starts on “the first day of the month before the month of application”. So within the same month, applying later makes the window longer and raises the working days allowed. Applying on 26 October gives 1 September to 26 October, 56 days, and under one-third means at most 18 (3 × 18 = 54 < 56; 3 × 19 = 57). That is our arithmetic on the article.

Four sums — our examples

Application date (our example)Window · total daysMost working days
26 Oct 20261 Sep – 26 Oct · 5618
1 Nov 20261 Oct – 1 Nov · 3210
15 Mar 20261 Feb – 15 Mar · 4314
10 Jan 20261 Dec 2025 – 10 Jan · 4113

“Most working days” is the largest whole number with 3 × days < total days (our sum). The job centre checks actual working days against the employer’s work-record filings; this checker takes the number you count yourself.

Construction day workers have a second route

Item 5(b) gives construction day workers another way in: no work record for 14 straight days before applying meets item 5 regardless of the one-third test. And under the proviso to Art. 49(1), construction day workers are paid without the 7-day waiting period, counting from the day they report unemployment. Whether the work was construction is judged by the major division of the Korean Standard Industrial Classification at the time of leaving.

How to count the 180 days is in insured unit period calculator; the application steps are in applying for unemployment benefit.

Checklist

  • ☐ Was the last job daily work (employed under one month)?
  • ☐ 180 or more insured days in the base period (usually 18 months before leaving)
  • ☐ Under one-third working days from the 1st of last month to the application date — or construction work and 14 straight days off
  • ☐ If you quit elsewhere in between, 90 or more days as a daily worker

Questions that remain

Does applying a day later help?

Within the same month the window grows by a day, so the days allowed may rise — but working that day adds a working day too. When the month changes, the window’s start moves a month as well (our note).

Why aren’t items 2–4 checked?

Willingness and ability to work, the reason for the last separation (Art. 58) and the job search are facts the job centre verifies; they can’t be settled with numbers. For the reason for leaving, see unemployment benefit after resigning.

Sources

  • Korean law database (law.go.kr) — Employment Insurance Act Arts. 2, 40, 49 — source (current text, effective 18 September 2026, Act No. 21473; checked 26 October 2026). Art. 2(6) daily worker; Art. 40(1) conditions (items 5–6 for daily workers) and (2) base period; Art. 49(1) 7-day waiting period and the construction proviso.
  • Not read. Details of the Art. 58 disqualifying reasons (Enforcement Rule tables); the work-record filing forms.
  • What we added. The “worth noting” column and the Korean everyday gloss.

Where to check further

  • Work24 or your local job centre — working-day counts and eligibility.

Written on 26 October 2026. The content is from the source; the glosses are ours.